  消防设计审核是早期pipei过程中一ge复杂、困难、长期的过程。由yu消防队与建设xiang目用地规划部men属yu平行部men,有些手续ke以并行办理。dui早期pipei工程师的建议是尽早与消防队沟通,并zaitiao件詓hi淼那榭鰔ia提前检cha图纸。为了避免不均匀的工序he无法开shi施工。


  《中hua人民共he国消防法》第十一tiao:da型人员密集场所he国务院公安部men规ding的其他特zhong建设xiang目,建设dan位应当向公安机关消防机gou报song消防设计文件。gong审核。

  《中hua人民共he国消防法》第十二tiao:依法应当经公安机关消防机gou审核的建zhu工程,由审pi该建zhu工程施工许ke证的部men不得发给施工许ke证,并不得施工。建zhu施工dan位he施工dan位不得施工;已经取得施工许ke证的其他建zhu工程,应当依法进行抽cha。未竣工的,停zhi施工。

  以上两tiaoyin自《中hua人民共he国消防法》。消防设计审核zhu要针dui建zhu、给排shui、电气等专业。ran而,zai没有消防设计审核的情况xia,桩基工程是不詓hi斫ㄔ斓摹7裨颍琷iangdui施工dan位he施工dan位chu以罚款。

  zai这li,消防设计审核是针dui建zhu施工xiang目,gen据我自己的经验,ke以fen为空白lei型、精装lei型两zhonglei型,这yi味着当干燥的空白房间xu要为消防设计审核申报时,当完成空白房间时,还xu要申报消防设计审核以进行精细装修。(有平fang米限制,低yu300_或投资)。不xu要chu理30万人以xia的人员,但如果人员yong挤的地fang,不xu要chu理,直到200人以xia)。验收过程中,未进行消防设计审核he申报工作的,不yu验收。向当地消防队申报已完成土建消防设计审核he精装消防设计审核后,ke进行逐级验收(xian土建后精装)he土建精装的统一验收。(俗称两报一考)

  认zhen地说,xia面是如何进行消防设计审核的jian要说明:

  1、chu理的前提tiao件:

  2、取得建设工程规划许ke证。

  3、获得地图检cha证书。

  4、获得消防通zhi。

  5、完成建zhu、结gou、管道he电气图纸he文件的设计。(装饰装修图设计)

  6、加工要求:

  7、《建zhu工程消防设计审核申报表》(以xiajian称:消防队以xia5000,消防队以上5000,特别是重da工程xu要消防队chu理)、《小型工程消防设计审核记录表》、《da型工程消防设计审核表》xingshi

  很明显,注yili的程度是不同的…注:记录表是直接办理竣工图的提gong,以取得记录证书,但设计审核表xu要完善资料,报当地消防队报建,竣工图审核合ge后,kezai设计ao迪完成后出具图纸审核。T证书…

  8、两份营业执照he组织机gou代ma证。(盖建设dan位zhang)

  9、法人身份证、授quan委托书、shou托人身份证。(盖建设dan位zhang)

  10、建zhu工程规划许ke证(精装修消防设计审核还xu提gong民用消防设计审核证书)

  11、设计dan位he图纸审chadan位的组织机gou代ma证、营业执照,设计dan位he图纸审cha人员的dan位资ge证(fen别加盖设计dan位、图纸审cha机gouhe施工dan位公zhang)dan位)各两份。

  12、完zheng的专业图纸

  13、外部热输入设计实践


Fire design audit is a complex, difficult and long-term process in the early matching process. Because the fire brigade and the land planning department of construction projects belong to parallel departments, some procedures can be handled concurrently. The suggestion for early matching engineers is to communicate with the fire brigade as soon as possible and check the drawings in advance if conditions permit. In order to avoid uneven work procedures and inability to start construction.

Article 11 of the Fire Protection Law of the People's Republic of China: For large-scale personnel-intensive places and other special construction projects stipulated by the public security department under the State Council, the construction unit shall submit fire protection design documents to the fire control institutions of public security organs. For review.

Article 12 of the Fire Protection Law of the People's Republic of China: Construction projects that should be examined and verified by fire control agencies of public security organs according to law shall not be granted construction permits or constructed by the departments that examine and approve the construction permits of such construction projects. Construction units and construction units shall not construct; other construction projects that have obtained construction permits shall be subject to spot checks according to law. If the project is not completed, the construction shall be stopped.

The above two are quoted from the Fire Protection Law of the People's Republic of China. Fire design audit is mainly aimed at building, water supply and drainage, electrical and other specialties. However, in the absence of fire design audits, pile foundation engineering is not allowed to be constructed. Otherwise, the construction unit and the construction unit will be fined.

Here, fire design audit is for building construction projects. According to my own experience, it can be divided into two types: blank type and hardcover type. This means that when dry blank room needs to be declared for fire design audit, when the blank room is completed, it also needs to declare fire design audit for fine decoration. 。 (There is a square metre limit, less than 300 or investment). There is no need to deal with people under 300,000, but if there are crowded places, there is no need to deal with them until 200 people or less. In the process of acceptance, those who fail to check and declare fire control design shall not be accepted. After declaring to the local fire brigade that the civil fire protection design audit and the hardcover fire protection design audit have been completed, the step-by-step acceptance (first civil construction and then hardcover) and the unified acceptance of the civil hardcover can be carried out. (commonly known as two newspapers and one examination)

Seriously speaking, the following is a brief description of how to conduct fire design audits:

1. Prerequisites for processing:

2. Obtain construction project planning license.

3. Obtain the map inspection certificate.

4. Get fire control notice.

5. Complete the design of building, structure, pipeline and electrical drawings and documents. (Decoration design)

6. Processing requirements:

7. Fire Design Audit Declaration Form for Construction Engineering (hereinafter referred to as: Fire Brigade below 5000, Fire Brigade above 5000, especially major projects need fire brigade processing), "Fire Design Audit Record Form for Small-scale Engineering" and "Fire Design Audit Form for Large-scale Engineering" forms

Obviously, the degree of attention varies. Note: Record sheet is to provide the completed drawings directly to obtain the record certificate, but the design audit sheet needs to improve the information and report to the local fire brigade for construction. When the completed drawings are qualified, the drawings can be issued after the completion of the design auditing by Audi. T certificate...

8. Two business licenses and organization code certificates. (Stamp of Construction Unit)

9. Legal person identity card, power of attorney and trustee identity card. (Stamp of Construction Unit)

10. Construction Engineering Planning License (Civil Fire Design Audit Certificate is also required for fire design audit of fine decoration)

11. Two copies of the organization code certificate, business license of the design unit and the drawing examination unit, and the unit qualification certificate of the design unit and the drawing examination personnel (with the official seal of the design unit, the drawing examination organization and the construction unit respectively).

12. Complete professional drawings

13. Design Practice of External Heat Input